{"id":1652,"date":"2022-06-27T20:19:43","date_gmt":"2022-06-27T20:19:43","guid":{"rendered":"https:\/\/www.big-eu.org\/case-studies\/the-centre-for-applied-technology\/"},"modified":"2022-08-17T12:54:28","modified_gmt":"2022-08-17T12:54:28","slug":"the-centre-for-applied-technology","status":"publish","type":"case-studies","link":"https:\/\/www.big-eu.org\/case-studies\/the-centre-for-applied-technology\/","title":{"rendered":"The Centre for Applied Technology"},"content":{"rendered":"\n
The Centre for Applied Technology (CAT) is the largest building on Northern Alberta Institute of Technology\u2019s (NAIT) Main Campus, covering 51,600 square meters while hosting approximately 5,000 full-time students. CAT is more than 25% of the total size of all of NAIT\u2019s main Campus buildings combined, and is 60% larger than NAIT\u2019s second largest building, the HP Centre. The building has been fitted with the Reliable Controls MACH-System\u2122, which has aided in the building\u2019s LEED\u00ae Gold certification.<\/p>\n\n\n\n
Reliable Controls Authorized Dealer, Serv-All Mechanical Services, Ltd., successfully completed this new construction project for the NAIT CAT facility, which resulted in LEED Gold certification.<\/p>\n\n\n\n
The networked, MACH-System\u2122 hardware is connected to an operator workstation, which is installed on an internal IP network. Operators and facility managers use the workstation to access the full BACnet\u00ae-enabled system.<\/p>\n\n\n\n
The mechanical equipment onsite includes BACnet-enabled chillers, boiler, and variable frequency drives (VFDs). Additionally, hard point control to air systems, heat pumps, standalone A\/C units, VAV boxes, and fan coils are installed.<\/p>\n\n\n\n
Chilled beams and chilled radiation panels make this project special. The project is unique because exhaust air from the basement is used to pressurize the parkade for heating and ventilation.<\/p>\n\n\n\n
Achieving proper pressures from the 5-storey atrium to the outside proved to be a challenge, as did balancing the pressure from the parkade and basement with the parkade doors opening and closing.<\/p>\n\n\n\n
This LEED Gold certified facility is projected to realize substantial energy savings.<\/p>\n","protected":false},"excerpt":{"rendered":"
The Centre for Applied Technology (CAT) is the largest building on Northern Alberta Institute of Technology\u2019s (NAIT) Main Campus, covering 51,600 square meters while hosting approximately 5,000 full-time students. CAT […]<\/p>\n","protected":false},"featured_media":0,"template":"","country":[97],"market":[142],"manufacturer":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.big-eu.org\/wp-json\/wp\/v2\/case-studies\/1652"}],"collection":[{"href":"https:\/\/www.big-eu.org\/wp-json\/wp\/v2\/case-studies"}],"about":[{"href":"https:\/\/www.big-eu.org\/wp-json\/wp\/v2\/types\/case-studies"}],"wp:attachment":[{"href":"https:\/\/www.big-eu.org\/wp-json\/wp\/v2\/media?parent=1652"}],"wp:term":[{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.big-eu.org\/wp-json\/wp\/v2\/country?post=1652"},{"taxonomy":"market","embeddable":true,"href":"https:\/\/www.big-eu.org\/wp-json\/wp\/v2\/market?post=1652"},{"taxonomy":"manufacturer","embeddable":true,"href":"https:\/\/www.big-eu.org\/wp-json\/wp\/v2\/manufacturer?post=1652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}