{"id":3480,"date":"2023-05-24T23:42:06","date_gmt":"2023-05-24T23:42:06","guid":{"rendered":"https:\/\/www.big-eu.org\/case-studies\/capital-centre\/"},"modified":"2023-05-24T23:42:12","modified_gmt":"2023-05-24T23:42:12","slug":"capital-centre","status":"publish","type":"case-studies","link":"https:\/\/www.big-eu.org\/de\/case-studies\/capital-centre\/","title":{"rendered":"Capital Centre"},"content":{"rendered":"\n

Environmental Automation, an Australia-based Reliable Controls Authorized Dealer, successfully completed a building automation system update project for Capital Centre, an office tower in Sydney, Australia. The project resulted in a 67% reduction in energy consumption and an expected four-year return on investment.<\/p>\n\n\n\n

The office tower, located within the Sydney Hilton Hotel, is an eight floor tower with a total floor area of 15,429 m2 (166,078 ft2) with services independent of the hotel. Mechanical services and the ancillary plant and equipment serving the office towers were last refurbished in 2006; however, in the years following the refurbishment, there were issues with reliability and operating costs, which gradually escalated to undesirable and unsustainable levels. The system had also reached the end of its product support life, which contributed to the escalating issues and costs.<\/p>\n\n\n\n

Key objectives included:<\/strong><\/p>\n\n\n\n