Case Studies

Metropolitan Museum of Art

New York, NY, United States
Sonstiges
Completed: 2006
Metropolitan Museum of ArtMetropolitan Museum of Art

The MACH-Global™ controllers installed at the Metropolitan Museum of Art reside on a dedicated Cisco Layer 3 network on copper and fibre optic media which allow for Virtual Private Networking used for remote access to BMS equipment. With the installation of a Reliable Controls® MACH-System, the museum is able to integrate HVAC and lighting control by using Iconics Genesis 32 HMI with BACnet® to OPC servers and integrate with Koyo PLC’s and Staefa System II architecture.

The installation has made real-time system I/O available over a dedicated TCP/IP network. Maintaining temperature and humidity is critical in preserving priceless art collections, conservation areas, and art storerooms.

Number of Buildings1
Total Area2.5 million
Products/Equipment Installed

1 Reliable Controls ETHER-Link BACnet Building Controller
2 Reliable Controls MACH-Vision Controllers
6 Reliable Controls SMART-Sensors
13 Reliable Controls MACH-Global BACnet Building Controllers

Systems IntegratedChiller, HVAC, VAV
Number of Devices22
System Points700
Controls ContractorDigital Network Services
Controls ContractorReliable Controls, Siemens
arrow-l-bluearrow-l-warrow-larrow-rarrow-whitecaret-down-hovercaret-downchevron-down-wchevron-downchevron-leftchevron-rightcircle-xclose-menuclosedot-w-actdot-wexternalfacebook-squarehamburgerinstagram-squarelinkedin-squarelist-polygonminuspausepinplayplussearch-greensearchtopic-icontwitter-squarexyoutube-square